top of page

PRODUCTION

Logo%20Black%20001_edited.png

NODAL ANALYSIS FOR PRODUCTION OPTIMIZATION

Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

PROGRESSING CAVITY PUMPING (PCP)  

Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

ELECTROSUBMERSIBLE PUMPING (BES

Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

MECHANICAL PUMPING (BM

Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

FUNDAMENTALS OF PRODUCTION ENGINEERIN

Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

LAG BASIC-INTERMEDIATE
Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

PRODUCTION METHODS

Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

POLYMERS IN SOLUTION APPLIED IN HYDROCARBON PRODUCTION

Duration: 24 hours

Online sinchronic

Logo%20Black%20001_edited.png

OIL AND GAS PRODUCTION

Duration: 24 hours

Online sinchronic

  • Icono social Instagram
  • Facebook
  • Icono social LinkedIn
  • telegram 01
  • Trapos
  • WhatsApp
  • X

© 2020 by Static Model Consultants

© 2020 Petröleum Consultores S.A.S.
    Version 1.6.7.

bottom of page